Jindalba FRP Boardwalk Case Study in Daintree
This Tech Talk Tuesday session presents the Jindalba Boardwalk case study, a NatureTREAD™ FRP boardwalk project delivered by Treadwell in partnership with Queensland Parks and Wildlife Service. The boardwalk is located in the Daintree Rainforest, within the Wet Tropics World Heritage Area, close to the Daintree Discovery Centre.
Queensland Parks identifies Jindalba Boardwalk as part of the Cape Tribulation section of Daintree National Park, around 115 km north of Cairns. The walk allows visitors to experience dense lowland rainforest and crystal-clear creeks from a defined access route.
The project replaced an existing timber boardwalk that had reached the end of its service life after approximately 20 years. In the hot, wet and humid rainforest environment, the previous timber structure was affected by rot, stagnant water, slip hazards and ongoing maintenance demands. Treadwell was engaged to design and supply a new FRP boardwalk structure that could deliver longer service life, improved safety and reduced impact during construction.
Key Benefits
Designed for a harsh rainforest environment
Reduced maintenance burden for Queensland Parks
Long design life
Anti-slip mini mesh decking
Low impact construction methodology
Lightweight components for remote installation
Reduced on-site fabrication
Seamless integration with existing FRP bridges
Hybrid aesthetic solution
Applications
Rainforest boardwalk replacement projects
The Jindalba project is a strong example of replacing ageing timber boardwalks in wet tropical environments with FRP structures designed for longer service life and lower maintenance.
National park access infrastructure
Wet and humid public access environments
Low footprint footing systems
Projects requiring prefabricated FRP layouts
Boardwalks with anti-slip public decking
Hybrid FRP and timber public infrastructure
Remote or constrained construction sites
Bridge and boardwalk integration
Public assets requiring routine cleaning access
The Q&A notes that the boardwalk is blown down weekly by the parks team. To assist with cleaning, the FRP curb rail was elevated using packers at intervals, making leaf litter easier to clear.
Key Moments
- 00:25 👋 Webinar begins with an introduction to the Jindalba Boardwalk project and invites questions for the end.
- 04:01 🌿 The project focuses on a Daintree Rainforest boardwalk delivered by Treadwell with Queensland Parks and Wildlife Service.
- 04:29 🪵 The previous timber structure lasted about 20 years but suffered from rot, stagnant water, and slip/trip hazards.
- 05:09 🧪 FRP is explained as fiberglass reinforced polymer made from glass reinforcement and resin, with additives like UV stabilizers and fire retardants.
- 06:08 🛡️ FRP’s corrosion, rust, and rot resistance was a key benefit for the wet, humid Daintree environment.
- 06:51 📐 Treadwell’s scope included design, FRP arrangement drawings, material supply, framing layouts, grating layouts, and connection designs.
- 07:53 🌱 Concrete pier footings and lightweight FRP helped minimize environmental impact during construction.
- 08:21 🔧 Queensland Parks needed a more durable solution because the timber structure required frequent recoating and inspections.
- 08:49 🚶 The FRP mini mesh decking improved safety and accessibility with AS 4586 compliance, P5 slip resistance, and R13 rating.
- 09:31 🏗️ Materials were supplied in optimized sizes to reduce onsite fabrication to drilling, bolting, and assembly.
- 09:57 🌉 The project integrated with FRP bridges previously installed around 10 years earlier, without needing bridge modifications.
- 10:39 🪚 A timber handrail was added for aesthetics and engineered as a compliant balustrade bolted to the FRP boardwalk.
- 11:05 ⏳ The boardwalk was designed for a 50-year design life, supported by proven FRP performance exceeding 55 years.
- 11:54 👷 Adrian Butcher Building completed the construction after winning the separate public construction tender.
- 12:37 💪 FRP’s lightweight nature allowed workers to hand-carry members into the remote rainforest site.
- 14:19 🍃 Leaf litter is managed through weekly blowdowns and an elevated curb rail detail that allows leaves to be cleared more easily.
- 15:19 📅 Typical design turnaround is 4–6 weeks, followed by around 10 weeks delivery for this project.
- 15:50 📏 The boardwalk was about 2 m wide, while Treadwell can produce structures up to around 4 m wide depending on design factors.
- 16:40 🧾 Treadwell provided footing reaction loads, while final footing certification came from a third party.
- 17:08 🌊 The bridge section used an FRP structure with a 15 m clear span, using truss-style or deep FRP girder arrangements.
- 17:42 📊 Standard walkway beam designs commonly span up to 5 m between columns, with Jindalba using 3–4 m footing spacing.
- 18:23 ✅ Treadwell can support certification case-by-case, either by educating external engineers or certifying in-house where appropriate.
- 18:50 📤 The presentation and construction video link will be shared after the webinar.
Why Treadwell?
Treadwell’s value on the Jindalba Boardwalk project was in delivering an FRP solution that responded to the real conditions of the Daintree Rainforest: high humidity, heavy rainfall, sensitive ground conditions, public safety requirements and difficult construction access.
Through NatureTREAD™, Treadwell supports public infrastructure projects, such as boardwalks, pedestrian bridges, access ramps, and outdoor structures, using FRP materials. NatureTREAD™ states that its FRP boardwalk systems are designed for settings such as marshlands, wetlands, dunes, riverbanks and nature reserves, where access must be provided while reducing environmental impact.
The project also shows Treadwell’s ability to work from survey information through to the issue of construction drawings, framing layouts, grating layouts, connection detailing, manufacturing, and supply. A third party handled the footing certification, while Treadwell provided the required data, such as reaction loads, to support the certification process.
For parks authorities, councils, contractors and public infrastructure teams, Treadwell provides FRP systems that combine durability, low maintenance, anti-slip safety and low-impact installation. The Jindalba Boardwalk demonstrates how those benefits can be applied in one of Australia’s most demanding rainforest environments, creating safer access while protecting the natural setting.