Our Product
Brands

Our Product
Brands

Caulfield to Dandenong Level Crossing Removal

Caulfield to Dandenong Level Crossing Removal

Melbourne’s busiest rail line underwent a transformationthat saw the removal of nine dangerous and congested level crossings, to be replaced by an elevated rail design. This elevated rail is able to carry both passenger and freight trains. As part of these new stations, it was decided that FRP access structures would in included in the construction of the new stations as well as the rail track.

Treadwell was engaged to provide the safety egress, access platforms and the central walkway between the rail tracks.

Project Challenges

  • Decking for the central walkway had to be easily remove for maintenance access.
  • Stepovers had to be non-slip, and maintain structural integrity while in permanent outdoor exposure.
  • Products had to be installed without the use of heavy machinery.

Project Information

Project Category: Rail Infrastructure
Scope of Work: Design & supply FRP grating and decking
Treadwell Products :

  • ACCESS SYSTEMS GratEX® FRP Mini Mesh grating
  • EcoEX™ SureLine® Heavy Duty FRP panels

Treadwell Solution

Explore INDUSTRUCT™

Get In Touch

Contacts Us

1800 246 800

sales@treadwellgroup.com.au

Scroll to Top

Make an Enquiry