Our client was one of the designated subcontractors for the design, development, implementation, testing and commissioning of a desalination plant in Australia. This was part of an expansion project that would double the capacity of the existing plant.

As per the plans, this new infrastructure would be integrated to the existing operations. This called for instrument stands, among other improvements, to be installed. Treadwell was engaged to provide the FRP solution to address these requirements.

Project Challenges

  • Products would be constantly exposed to chemicals and moisture.
  • Maintenance cost and downtime were a concern as the plant had to remain at constant high productivity levels.
  • Material had to be non-conductive and customisable to single, double and triple posts.

Project Information

Project Category: Desalination Plant
Scope of Work: Provide customised instrument stands
Treadwell Products :

  • EXduro™ Instrument Stands